Client: Private land owner
Project location: Suffolk
Engineer: Gatley Smithers Purslow
Insurer: NFU
STRESS worked up a solution that was practical to build given the constraints of the site. Instead of going down the route of a heavier, more disruptive construction method, we proposed using tube lining alongside masonry work.
This allowed us to avoid bringing in large plant and reduced the need for concrete pumping. In turn, it made the job quicker, less intrusive, and more cost-effective.
During delivery, we focused on keeping things straightforward and well managed. That included safely demolishing what remained of the culvert, carefully handling access across private land, and choosing construction methods that suited the tight working space. We also stayed in close contact with the loss adjuster, the policyholder, and the wider project team throughout.
The culvert was fully rebuilt using an approach designed around both the site limitations and the need for long-term performance.
We installed a tube lining system as a lighter alternative to more traditional methods and increased the diameter of the culvert to better handle higher water flows. Some of the original design features were kept so that the new structure remained in keeping with what was there before. Bat boxes were also included, in line with the environmental recommendations.
The end result is a much more resilient structure without the cost and disruption that the earlier proposal would have involved.
The work was completed within four weeks from starting on site, with minimal impact on the surrounding area despite the access challenges. Overall costs were lower than initially expected, and the use of lighter materials reduced the impact of construction.
Importantly, the culvert now has greater capacity and should perform much better during future flood events, while also contributing more effectively to the wider local drainage network.
David Kitching
Stress UK,
Managing Director
This was another project where we were commissioned to carry out some specific remedial structural repairs to brickwork but were then challenged to find a solution for replacement of load bearing stonework at high level. We produced a temporary works design which was checked by CTP Consulting, and we thank Cliveden Conservation Workshop for their excellent stonework. It was a pleasure to work with a forward-thinking team and client.