Avoiding settlement and collapse when building a new basement into river gravels

Client: Dorchester Hotel

Location: Stanhope Gate, London

Main contractor: Erith Ltd

Budget: £238,000

Solving construction problems amongst London’s architecture

The problem was to devise a way to construct foundations and a basement adjacent to a seven-storey listed building without causing potential settlement damage.

The piled capping beam of the new building had to be constructed approximately 1m below the level of the footings of the adjacent block. These concrete footings were founded on non-cohesive terrace river gravels. Excavation into this deposit would have risked collapse of even a short length trench and the likely settlement of the flank wall. STRESS were called in to design a temporary works scheme to strengthen the gravels so that short sections of the capping beam trench could be excavated below the foundation level without risk of collapse and settlement.

The solution

Using our patented ReFORCE permeation engineering system of ground stabilisation our technicians injected the terrace river gravels to a depth of 2.5m below site level for the full length of the flank wall.

Using a hit and miss method the main contractor then excavated into the grout stabilise deposit and constructed the RC capping beam in 2.5m lengths without any signs of the sides of the trench collapsing under the weight of the adjacent seven storey building.

Monitoring showed that not a single millimetre of movement was experienced by the adjacent building during the construction of the 38m long capping beam.

  • Patented ReFORCE permeation engineering system
  • Protecting a listed building from settlement and collapse in a busy capital city location
  • Injecting 38m of terrace river gravels at 2.5m below site
  • Design of temporary works scheme
    to support non-cohesive terrace
    river gravels
  • Supporting the main contractor
    with an innovative solution to a difficult problem Innovative low carbon solution.

David Kitching

Stress UK,
Managing Director

This was another project where we were commissioned to carry out some specific remedial structural repairs to brickwork but were then challenged to find a solution for replacement of load bearing stonework at high level. We produced a temporary works design which was checked by CTP Consulting, and we thank Cliveden Conservation Workshop for their excellent stonework. It was a pleasure to work with a forward-thinking team and client.